Block Walls
Block count formula
Blocks = courses × blocks per course
Block Wall Reference
Size a CMU wall and estimate blocks, mortar, grout and rebar. Planning quantities only, sized for ordering material.
Wall Planner
20 ft × 6 ft
Block Width
Rebar Spacing (on center)
Fill Cores Solid
Adds grout for every core cell.
Blocks (5% extra)
142blocks
Courses
915 / course
Mortar Mix (80 lb)
12bags
Grout / Core Fill
1.40yd³
Grout Bags (80 lb)
64bags
#4 Rebar
56ft
Wall face 120 ft² (20.0 ft × 6.0 ft). Rebar plan: 6 vertical bars plus 1 horizontal runs at 4 ft on center. Block and mortar counts include a 5% breakage allowance; grout is computed only for walls filled solid.
Material Pricing
Quantities come from your wall planner. Price them out and the grand total adds your concrete order.
Blocks & Mortar
from the wall plannerRebar
3 bars · 20 ft sticksConcrete
core fill from the plannerGrand Total
View orderConcrete and rebar are priced with the ready-mix and rebar rates from your order summary.
Block, mortar, rebar and concrete prices start at this month's national averages and refresh every month. Edit any field to match your supplier.
Block Sizes
Standard concrete masonry units (CMU) are sold by nominal size; the actual block is smaller so a mortar joint brings it back to the nominal face.
| Width | Nominal | Actual | Weight |
|---|---|---|---|
| 6 in | 6 × 8 × 16 | 5⅝ × 7⅝ × 15⅝ | ≈ 28 lb |
| 8 in | 8 × 8 × 16 | 7⅝ × 7⅝ × 15⅝ | ≈ 38 lb |
| 12 in | 12 × 8 × 16 | 11⅝ × 7⅝ × 15⅝ | ≈ 55 lb |
Course Heights
Each course adds 8 in, so walls land on whole courses: 6 courses is 4 ft, 9 courses is 6 ft.
3 courses
2 ft
6 courses
4 ft
9 courses
6 ft
12 courses
8 ft
15 courses
10 ft
Materials at a Glance
Blocks lay 1.125 per square foot of wall face (16 in × 8 in nominal), so a 10 ft × 6 ft wall takes about 68 blocks before the breakage allowance.
One 80 lb bag of mortar mix lays roughly 12 standard blocks, including the bed and head joints.
Cores hold about 0.28 ft³ of grout in an 8 in block, 0.17 ft³ in a 6 in block and 0.45 ft³ in a 12 in block. Only fill the cores the design calls for.
A horizontal bond beam is usually placed every 4 ft of height, with vertical bars at 4 ft on center and a lap into the footing.
Block walls move: control joints are typically needed every 20 to 25 ft, and a reinforced footing is required under any wall over a couple of courses.
These are planning quantities for ordering material. Confirm footing, grouting, reinforcement and joint layout with a licensed engineer before building.